Selected work

Product data

Catalogue auto-enriched from PLM and commerce

Internal tools showed product rows with no product images, because the images lived in PLM and getting them out was a manual download. We built a pipeline.

Colourway coverageAW27 catalogue
Demo data
Source: allSeason: AW272,592 SKUs
KT-2240
NavyPLM
KT-2240
BonePLM
KT-2240
MossRetail
BW-1180
WhitePLM
BW-1180
SkyPLM
BW-1180
ClayRetail
TR-0907
BlackPLM
TR-0907
SandRetail
Last enrichment run 09:12 · 14.6 minPLM 2,223 · retail fallback 369 · unresolved 0
Product data module — colourway coverage, marking which images came from PLM and which from the retail fallback. Demonstration data throughout.
Function
Product data
Primary source
PLM
Fallback
Live retail sources
Throughput
~600 SKUs / 15 min
Case note

The problem

Every internal screen that listed products listed them as text. The images existed — they were in PLM — but pulling one meant opening PLM, finding the style, downloading the asset and putting it somewhere the tool could reach. At catalogue scale nobody did this, so nobody did it at all.

PLM coverage was also incomplete. Some styles had no usable asset attached, so even a full export would have left gaps.

What we built

A pipeline that treats PLM as the primary source and live retail listings as the fallback. It walks the catalogue, takes the PLM asset where one exists, and where one doesn't it resolves the product against public retail sources and takes the image from there.

Results are served through the internal tools directly, so a screen that used to render a row of text now renders the product.

How it landed

The pipeline processes roughly 600 SKUs in fifteen minutes, which makes a full catalogue refresh a scheduled job rather than a project. The fallback path matters more than the throughput: it is what takes coverage from "most styles" to "effectively all of them".

Anonymised by agreement. We'll walk you through the specifics — the system, the numbers, the parts that went wrong — on a call under NDA.

Next

Concept to live in two weeks

Greenfield build

Start here

Tell us which process is costing you the most.

One process, one week inside it, and a straight answer on whether you should build anything at all.